Contact Us
Tell us what the slab is doing and what it does for a living.
What Helps Us Answer Well
Photos of the failure. Joint spalling, cracking, delamination, and impact damage all look different and call for different sequences. A picture saves three emails.
What the floor does. Forklift traffic, wash-down, chemical exposure, freeze-thaw, cold service, food processing — the environment drives the topcoat selection more than the square footage does.
The square footage and the linear feet of joint. These are usually different numbers and we need both to quote material.
Your schedule. If the building cannot come down, say so up front — it changes the sequence.
Contractors and distributors: include your region and approximate annual volume and the wholesale schedule comes back with the answer.
Request a Repair Spec & Pricing
Concrete contractors, floor coaters, facility managers, and distributors — one business day response.